1xml version="1.0" encoding="iso-8859-1"?>
![]() |
Team members get ready to lay the kevlar fabric on the freshly polished mold. |
![]() |
Jason and Brian wet the balsa wood core with epoxy before it's laid on the Kevlar. |
![]() |
The first few layers of kevlar are laid in the mold and team members trim the edges. |
![]() |
Smoothing out the wrinkle in the fabric to ensure good strength. |
![]() |
More smoothing of the fabric (this was a long process). |
![]() |
The "peel-ply" is laid down in the mold before the breather and plastic bagging to prevent sticking. |
![]() |
With the breather and plastic bagging in place and the vacuum lines in place, team members listen for air leaks and monitor the vacuum level. |